更多深圳桑拿会所体验报告:http://suo.im/5PMsVq Original title: Deep Shan high speed will change on the west net of 8 driveway ocean question is difficult on November 26, 2019 Shan high speed is another name for Guangdong Province the traffic east is aortic, and two-way 4 driveway had become his to often appear embrace the bottleneck that block up. Now, good news came! 25 days, shenyang reachs Shenzhen to abundant of land of end of Shan of freeway of big talk country Long Gang paragraph (deep Shan on the west high speed) change extend project annulus to judge be accepted by hall of province zoology environment and undertake fair show, deep Shan on the west will from two-way 4 driveway become 8 driveway, the project always invests nearly 30 billion yuan, predict t罗湖环保论坛his year start working of the end of the year. Bottleneck: Car flow is large but it is only two-way 4 driveway Shenyang reachs Shenzhen to abundant of land of end of Shan of freeway of big talk country Long Gang paragraph it is Shen深圳南澳浴场yang to freeway of big talk country (G15) main component, start is located in Tan Xizhen of land abu深圳沙井老街女50一次ndant city, new developed area of mountain of level ground of city of area of Hui Dong county of city of state of county of abundant of the city zone of city of end of Shan of by way of, sea, benefit, Hui Yang, Shenzhen, eventually area of hillock of Shenzhen city dragon. Full-length 146. 55 kilometers, built be open to traffic 1996. Through battalion of nearly 12 years carry is used, construction unit ever was opposite 2009 at 2008 ~ deep Shan freeway on the west paragraph all fronts road surface undertakes heavying repair. High speed is deep Shan now on the west two-way 4 driveway, roadbed width is 24. 5 meters, design driving speed is hour of 100 kilometers / . Shenzhen of deep Shan high 罗湖嘉悦水会700服务怎么样speed paragraph the eastpart part that is Shenzhen city basically is exported, it is another name for Guangdong Province east the main thoroughfare of come-and-go Shenzhen, after the be open to traffic of wet benefit high speed of as basic as deep Shan high speed parallel, because wet benefit high speed is 6 driveway freeway and design career is hour of 120 kilometers / , condition of drive a vehicle is better, partial another name for Guangdong Province east the liaison man that goes Shenzhen will arrive from move of deep Shan high speed on wet benefit high speed, pass wide benefit high speed next again new 深圳qm论坛悦来converge goes to Shenzhen of deep Shan high speed paragraph. Moving method of this kind of traffic will cause deep Shan high speed hole hub establishs Duan Ling on the west hand in with the traffic of a section of a highway is embraced on the west, cause of formation is wet benefit high speed, wide benefit high speed and deep Shan high speed want converge to go to this paragraph toward the traffic of Shenzhen direction, hillock of dragon of Shenzhen of high speed of deep 2018 Shan comes port of sea abundant goose paragraph average traffic already reached day 45539, and at present all fronts of deep Shan深圳休闲会所 查的严 high speed is only two-way深圳高端kb 4 driveway, number of channels of the car in road network is lopsided form those who bring about traffic bottleneck a section of a highway. Additional, there still is the high speed of hi深圳月畔湾桑拿推油gh speed of deep Shan outer shroud, river Hui Shan, high speed that promote Shan to wait to receive deep Shan newly in the program on the west high speed. So, begin deep Shan abundant of land of end of high speed Shan reachs Shenzhen dragon hillock on the west para深圳福田君悦水会333graph change extend the job is very necessary and very pressing. Environmental protection: By way of 3 office modes of life and relation to their environment is sensitive area and 3 place drinking water source groove guard Zuo door paragraph change a line to build paragraph of line: Start picket sign is K42 + 800, circuit by east westerly, ordinal masterstroke wears mansion below 4 depart deep Gao Tie, on G324 of the path that cross a state, set restful hole 2 one date, channel and restful ho深圳娱乐论坛le 2 big bridges pass through limits of restful hole reservoir, channel of hill of the young that set a wall passes through network of road of district of deep Shan collaboration is entered to plan after Yang Tiling, span with bridge form development highway, highway of science and education, deep Shan highway is worn in order to sink below type channel form, eventually village of hole of the name of a river 深圳罗湖环保js交流群in Shaanxi and Henan provinces of town of stone of bare of area of deep Shan collaboration, suitable receive deep Shan on the west high speed, terminal picket sign is K60 + 870. Course length 18. 07 kilomet深圳平湖休闲会所口吹ers. Goose port paragraph change a line to build paragraph: The course continues westerly, in road of program dragon hill (K63 + 700) change a line to build, set hole of innovation highway, long mountain range is crossed on the bridge, at K66 + city of 700 settings deep Shan (goose port) each other is connected (A single speaker stands hand in) join achieves Wen Lu, span respectively with bridge form start highway of river of Wen Lu, double hole, development and industrial journey, eventually before deep Shan serves an area (K68 + 500) . Course length 4800 meters. Annulus is judged in still disclose, project along the line involves Guangdong sea abundant park of wet land of level of county of 9 dragon bay mixes county of abundant of avian and provincial natural groove guard, sea park of forest of hole of Shenzhen city pine nut 3 office modes of life and relation to their environment is sensitive area. In addition, still will pass through 3 place are drinkable fountainhead 2 class groove guard. Carry fast: Speed of partial a section of a highway will raise hour of 120 kilometers / to change extend project starting point in Liu Feng Tanxi presses down butt joint deep Shan east high speed, city of state of area of collaboration of city of end of Shan of course Xiangxi by way o深圳按摩包吹f, deep Shan, benefit, Shenzhen city, terminus receives pass through the territory of a country of benefit salt high speed, the eastpart part to install monetary col to stand quickly in area of hillock of Shenzhen city dragon hand in, full-length 146. 07 kilometers, build course among them about 22. 87 kilometers, old way changes extend course about 123. 2 kilometers. Recommend plan to collect in order to broaden of two side joining together is given priority to, broaden of odd side joining together is complementary 8 driveway change extend plan; A section of a highway of the part after changing extend designs speed general to increase hour of 120 kilometers / from hour of original 100 kilometers / . Project all fronts always invests 296. 8.5 billion yuan. Plan start working was built in December 2019, in December 2024 be open to traffic. Annulus is judged in disclose at the same time, december 2018, area of deep Shan collaboration puts forward to ask to be opposite deep Shan on the west door of high speed Zuo paragraph with goose port Duan Jin is built all right change a line; Benefit state city puts forward to ask to be opposite former worker worker but in each other connects the new developed area of annulus Daya Bay of obligate to bring into this project to carry out along with all the others; Shan end city asks to add Hai Fengdong each other newly to connect. In the meantime, city of state of area of deep Shan collaboration, benefit, Shan end city saves traffic 深圳升逸水疗飞机hall to communicate communication with Guangdong for many times, get traffic hall agrees. This second change extend project course to show east – move toward on the west, start is located in land abundant Tan Xizhen (deep Shan on the west with deep Shan east boundary) , course to on the west, in K8 + 900 set west lake each other to connect (receive the high speed that promote Shan) , continue to on the west, in bare bank line slants southwest trend, reservoir of course gold stannum and south elegant reservoir, the course slants the west to, in red careless town 3 garde深圳梅花水会休闲会所n young crosses province path S242, set Bu edge each other to connect stand hand in, in Changsha bay (K34 + 850) X142 of next the path that wear a county, set Changsha bay each other to connect, span Changsha bay enters plum Gansu farm, in Mei Long farm bay village begins to change a line to build. Du Juan of reporter of entire media of daily of Guangzhou of / of article, graph