更多深圳桑拿会所体验报告:http://suo.im/5PMsVq Network of news of Shenzhen of · of end of client seeing Zhen on December 4, 2019 dispat深圳太平洋水疗会所消费ch (Tu Sheng of reporter of network of news of end of client seeing Zhen, Shenzhen) the reporter learns from Shenzhen subway group, suffer the subwa深圳龙岗水会服务y that a mountainous area citizen pays close attention to level ground fully 14 lines construction welcomes new progress, on December 4 morning, the subway 14 lines sanded lake stands last roof concrete is irrigated successfully build, sanded lake station finishs main body structure smoothly to seal a top. This is traffic of Shenzhen city orbit 4 period 14 lines the whole line 深圳福田桑拿按摩seals the project first times very station. In the meantime, 14 lines regard the subway as Shenzhen level ground a mountainous area first subway route, this sanded lake station seals a top smoothly, to come trdiscuz论坛 桑拿 成都ue construction of a mountainous area subway carries level ground character in the round fast laid solid foundation. Structure of main body of station of 14 lines sanded lake深圳水源国际水疗会所 seals the subway a cerem深圳海豚湾休闲都会onial spot. It is reported, this 14 lines seal the subway first times very Sha Hu stands, cloth of direction of thing of highway of hill of edge level ground is set, it is station of curve of type of 2 islan深圳福田桑拿会所全套ds of subterranean, use bright dig construction of suitable course of action, 288 meters long. For sa深圳蒲神桑拿论坛体验fety high grade and orderly ground advances construction o深圳高科德水疗推油f main body structure, in Shenzhen subway group elaborate organization falls, south of the iron in construction unit and in iron Guangzhou bureau overcomes early days to change change cop sort site of much, construction is narrow, geological it is a lot of and difficult that the condition carries difficult, inside and outside coordinates difficulty to wait greatly outside cubic meter of earth of poor, monsoon, resource of scientific organization, reasonable configuration, strengthen a process to control. In construction of structure of palisade of station main body, optimize construction craft, use complete set tube half circumgyrate is深圳明珠水会 体验报告 strong深圳福田休闲会所排名 dig borer, improved work efficiency of palisade structure construction; Use establish many come up out of land the mode of bit of flank excavate accelerated the plan that come up out of land and rate; Use dish buckle 深圳678水疗form of big pattern plate of bracket + side wall, compress working procedure to change time, created advantage to realize station whole construction. The building is built to undertaking concrete irrigate. The reporter understands, 14 lines regard the subway as level ground a mountainous area first subway express, it is Shenzhen ” east present the strategy ” main traffic line, case from hub of north of mansion of post of division of blessing tanaka heart, via collect lake area, dragon hillock area, stop at level ground a mountainous area Sha Tian stands. Circuit is full-length 50. 34 kilometers, set a station 17, car parking lot and car paragraph each 1. Notable is, 12 lines the whole line will use Shenzhen subway automation unmanned road-sense, highest design career is hour of 120 深圳维纳斯鑫都水疗kilometers / . 14 lines predict the subway formal 2022 be open to traffic, after circuit building, for HongKong and Macow of ano深圳明珠水会ther name for Gu深圳明月论坛 qmangdong Province big bay area is built and demonstrative area of Shenzhen construction go ahead of the rest produces main effect, level ground is a mountainous area at the same time will enter ” 45 minutes of traffic are encircled ” , drive area of level ground mountain to develop further, have important sense to promoting area competition ability and radiant emitance. Up to now, the subway progress of 14 lines project is smooth and orderly, project of early days of the first phase finishs 100 % , go into operation of project of main body construction leads 100 % , the ground already finished even the wall 94. 43 % , occlusive picket already was finished 95. 64 % , cubic metro of earth and stone already was finished 60. 32 % ; Already machine of 12 aegis compose undertakes driving in each interval, construction of main body structure and aegis compose construction already formed the favorable situation of advance side by side- do two or more things at once.